Sprinkler (Final) | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PASS |
Ron Ginner
|
|
|
Ron, just need to check for certification tag.backflow was tested by landscape outfit 5/02 4/3/2003 2:10:51 PM
|
Sprinkler (Final) | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PASS |
Ron Ginner
|
|
|
Ron, just need to check for certification tag.double check was certified on 5/02 by ellis landscape 4/3/2003 9:20:02 AM
|
Final | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PART |
Lee Rice
|
|
|
DALE ###-#### connection ok to cover will call back in when dcva is tested. 5/20/2002 12:22:06 PM
|