Final | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 11:26:40. Contact: ###-####.
|
Plumbing Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 15:13:00. Contact: ###-####.
|
Plumbing Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 | A | PART |
Jim Johnson
|
|
|
jan ###-#### repipe laves tub and shower and washer up to code 6/5/2002 11:00:14 AM
|