Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 09:22:33. Contact: ###-####. needs a sprinkler permit prior to final, connection to water service was done at the s/w stage 8/27/2002 3:13:53 PM
|
Plumbing Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 | P | PASS |
Bill VanDegrift
|
|
|
###-#### ray
|