Final | 11/7/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Bill VanDegrift
|
|
|
final ok 11/8/2002 3:47:13 PM
|
Final | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 09:49:16. Contact: ###-####. increase indirect aste sizing to handle full flow 11/7/2002 2:48:57 PM
|
Final | 10/15/2002 | 10/15/2002 | 10/15/2002 | A | PART |
Bill VanDegrift
|
|
|
whirlpool tubs must have hot and cold water R.P.s on the supplies, install over the floor sinks in the janitor room.
|
Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PART |
Bill VanDegrift
|
|
|
###-#### disconnect whirlpool tub supplies, will need r.p.s on supplies, will meet with bill thompson of united water to verify requirements, temp occ ok 10/11/2002 3:43:42 PM
|
Final | 10/8/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 13:50:05. Contact: ###-####. janitor sink needs avb, open control box for whirlpool tub, air gap required on water heater t&p drain, install shower head west end. 10/9/2002 4:07:28 PM
|
Plumbing Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 16:50:10. Contact: .
|