Final | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/08/2002 at 08:24:29. Contact: ###-####.
|
Plumbing Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | DONE |
Ron Ginner
|
|
|
conf. only\\###-#### or ###-####
|
Final | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | PART |
Gary Ziegler
|
|
|
###-#### same corrections 10/3/2002 7:46:32 AM
|
Final | 8/26/2002 | 8/27/2002 | 8/27/2002 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 11:37:00. Contact: ###-####. install pan on exsisting wh and releif line 8/27/2002 10:38:05 AM
|
Plumbing Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Gary Ziegler
|
|
|
needs premise protection 7/1/2002 3:05:40 PM
|