Final | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:01:46. Contact: ###-####.
|
Final | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:12:34. Contact: ###-####. need to expose drain for upstair,s unfinished lav remove panel for jetted tub inspection called contractor will recall when ready 9/23/2002 2:48:09 PM
|
Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Jim Johnson
|
|
|
###-#### nels
|