Final | 11/14/2002 | 11/14/2002 | 11/14/2002 | P | PASS |
Gary Ziegler
|
|
|
|
Final | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 08:39:51. Contact: ###-####.5579 10/3/2002 1:46:22 PM
|
Final | 9/30/2002 | 9/30/2002 | 9/30/2002 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 07:38:30. Contact: ###-####.bear foot tub-spout below flood level rim of tub in master bath. 9/30/2002 10:12:16 PM
|
Plumbing Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Gary Ziegler
|
|
|
PAT ###-####
|