Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 15:40:07. Contact: ###-####. prior to perm occ a dcva will need to be installed on the building water service and the boiler room will need to be assessed for cross connections, temp occ ok 8/7/2002 8:53:23 AM
|
Plumbing Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 15:10:55. Contact: ###-####. not too comfortable with 3 urinals on a 3/4" existing branch, will take one off and tee off a 1" branch. 7/16/2002 9:46:13 AM
|
Plumbing Rough-in | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | PASS |
Bill VanDegrift
|
|
|
ok to cover ,one urinal removed from 3/4 branch 7/16/2002 3:56:45 PM
|