Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Jim Johnson
|
|
|
###-####
|
Sprinkler (Final) | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PART |
Jim Johnson
|
|
|
tie in ok ok to cover need to have bach flow device tested and certified need plug,s for test port,s need to provide gravel 6 inches below backflow double check 7/30/2002 2:47:36 PM
|