PLM-Aging Inspection | 6/4/2003 | 6/4/2003 | 6/4/2003 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 3/24/2003 | 3/24/2003 | 3/24/2003 | | NR |
Ron Ginner
|
|
|
LACY WILL CALL FOR A FINAL 3/24/2003 8:49:07 AM
|
PLM-Aging Inspection | 1/10/2003 | 1/10/2003 | 1/10/2003 | | NR |
Jim Johnson
|
|
|
no request for final inspection 1/14/2003 11:39:32 AM
|
Plumbing Rough-in | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 14:23:20. Contact: ###-####.
|
Final | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 17:00:51. Contact: ###-####. moved sink with eye wash from upstair,s to a existing location down stair,s in lab area ( note- no premise protection or lab isolation protection) 7/26/2002 11:51:57 AM
|
Plumbing Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 17:00:12. Contact: ###-####. rough-in for new floor sink not ready 7/26/2002 11:47:53 AM
|