Final | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Bill VanDegrift
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok 9/24/2002 1:29:10 PM
|
Final | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PART |
Bill VanDegrift
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie finish 2 sinks, install 2 isolators at upper plate penatration in mech behind furnace. 9/12/2002 3:19:30 PM
|
Plumbing Rough-in | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | PASS |
Bill VanDegrift
|
|
|
the T&P drain is run to the outside ok, the grond floor below the water heater platform is going to get THICK ceramic tile so it will be below 8' to the platform and a ladder will not be required. 8/13/2002 2:10:40 PM
|
Plumbing Rough-in | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 10:13:21. Contact: ###-####. ladder required for water heater, install t&p drain to exterior. 8/9/2002 4:20:19 PM
|
Groundwork | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | PART |
Bill VanDegrift
|
|
|
gary later the better; Phone #: ###-#### just needs end of the line co 8/1/2002 10:28:59 AM
|
Groundwork | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Bill VanDegrift
|
|
|
check for end of the line c.o.
|