Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberPLM02-02365
StatusFinaled
Name HORIZON PLUMBING
Site Address 2475 S APPLE ST STE 106
Project NameCARRIAGE CROSSING-BLDG #2
Customer Number 
ePlanReview 
Description
2 TOILETS, 10 SINKS, 1 WASHING MACHINE, 1 WATER HEATER PER INITIAL CERT OF VALUE $7,600.00//11/22/02 NO ADDITIONAL VALUE
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/23/20029/24/20029/24/2002PPASS
DetailsBill VanDegrift
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok 9/24/2002 1:29:10 PM
Final9/12/20029/12/20029/12/2002PPART
DetailsBill VanDegrift
gary; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie finish 2 sinks, install 2 isolators at upper plate penatration in mech behind furnace. 9/12/2002 3:19:30 PM
Plumbing Rough-in8/13/20028/13/20028/13/2002PPASS
DetailsBill VanDegrift
the T&P drain is run to the outside ok, the grond floor below the water heater platform is going to get THICK ceramic tile so it will be below 8' to the platform and a ladder will not be required. 8/13/2002 2:10:40 PM
Plumbing Rough-in8/9/20028/9/20028/9/2002PFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 08/09/2002 at 10:13:21. Contact: ###-####. ladder required for water heater, install t&p drain to exterior. 8/9/2002 4:20:19 PM
Groundwork7/31/20028/1/20028/1/2002APART
DetailsBill VanDegrift
gary later the better; Phone #: ###-#### just needs end of the line co 8/1/2002 10:28:59 AM
Groundwork8/1/20028/1/20028/1/2002PPASS
DetailsBill VanDegrift
check for end of the line c.o.