Sprinkler (Final) | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | PASS |
Bill VanDegrift
|
|
|
JOEY ###-####
|
Sprinkler (Final) | 8/5/2002 | 8/8/2002 | 8/8/2002 | A | PART |
Bill VanDegrift
|
|
|
###-#### joey 160 min psi piping upstream of dcva, two clamps required at each joint upstream of the dcva, two unions required on the dcva installed below grade, ok to cover tie in. 8/8/2002 10:00:34 AM
|