Final | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 08:40:16. Contact: ###-####.
|
Groundwork | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 15:44:38. Contact: ###-####.
|
Plumbing Rough-in | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 15:44:17. Contact: ###-####.
|