Final | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 10:57:42. Contact: ###-####.
|
Plumbing Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | FAIL |
Ron Ginner
|
|
|
###-#### BRYAN no test on water or dwv, horizonal vent below flood level, pipe out of wall. 8/22/2002 8:38:11 AM
|
Plumbing Rough-in | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 08:42:33. Contact: ###-####.
|
Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | NR |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 08:32:05. Contact: ###-####.
|
Plumbing Rough-in | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | FAIL |
Ron Ginner
|
|
|
|