Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:11:23. Contact: ###-####. final ok 9/25/2002 9:31:57 AM
|
Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:11:23. Contact: ###-####. final ok 9/25/2002 9:31:57 AM
|
Plumbing Rough-in | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 08:51:57. Contact: ###-####.
|
Other | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PART |
Bill VanDegrift
|
|
|
conference on clawfoot tub valve cross connection control requirements
|
Plumbing Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | PART |
Bill VanDegrift
|
|
|
CONFERENCE JAY ###-#### every thing looks ok except the tubvalve has an inlet below the clawfoot tub rim 8/15/2002 2:08:30 PM
|