Water and/or Sewer | 3/8/2004 | 3/8/2004 | 3/8/2004 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
PLM-Aging Inspection | 3/1/2004 | 3/1/2004 | 3/1/2004 | | PART |
Bill VanDegrift
|
|
|
still going 3/1/2004 9:06:34 AM
|
PLM-Aging Inspection | 12/29/2003 | 12/29/2003 | 12/29/2003 | | PART |
Bill VanDegrift
|
|
|
needs rain drain completed in phase 2 12/29/2003 10:36:55 AM
|
Water and/or Sewer | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PART |
Bill VanDegrift
|
|
|
r.d.s.w. corner ok to cover
|
Water and/or Sewer | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | PART |
Bill VanDegrift
|
|
|
s.s. north side of phase 2 from backwater valve to branch ok 10/23/2003 1:53:40 PM
|
Water and/or Sewer | 10/20/2003 | 10/20/2003 | 10/20/2003 | A | PART |
Bill VanDegrift
|
|
|
starting sewer relocation on west end of area d
|
Water and/or Sewer | 10/20/2003 | 10/20/2003 | 10/20/2003 | A | PART |
Bill VanDegrift
|
|
|
still diggin at the interceptor 10/20/2003 3:39:39 PM
|
Water and/or Sewer | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | PART |
Bill VanDegrift
|
|
|
nothin else this mornin 10/17/2003 8:50:13 AM
|
Water and/or Sewer | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PART |
Bill VanDegrift
|
|
|
s.d. stub last north side storm stub area d, starting s.s. main north side area d 10/16/2003 8:56:08 AM
|
Water and/or Sewer | 10/16/2003 | 10/16/2003 | 10/16/2003 | P | PART |
Bill VanDegrift
|
|
|
another stub inti s.s. m.h. 10/16/2003 2:43:52 PM
|
Water and/or Sewer | 10/15/2003 | 10/15/2003 | 10/15/2003 | P | PART |
Bill VanDegrift
|
|
|
another s.s. stub out over the deep s.d. area d
|
Water and/or Sewer | 10/14/2003 | 10/14/2003 | 10/14/2003 | A | PART |
Bill VanDegrift
|
|
|
tied 2 4" s.s. services together at area d into a 6" service in tugway to connect to a relocated m.h., stopped 25' out of building.
|
PLM-Aging Inspection | 9/16/2003 | 9/16/2003 | 9/16/2003 | | PART |
Bill VanDegrift
|
|
|
not gradded 9/16/2003 8:38:47 AM
|
PLM-Aging Inspection | 7/17/2003 | 7/17/2003 | 7/17/2003 | | NR |
Bill VanDegrift
|
|
|
hold open till graded 7/17/2003 9:58:54 AM
|
Final | 5/16/2003 | 5/16/2003 | 5/16/2003 | A | FAIL |
Bill VanDegrift
|
|
|
cut stub into manhole and grout
|
Water and/or Sewer | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | PASS |
Bill VanDegrift
|
|
|
rain drain risers behind baggage area changed to sch 40 ok 4/4/2003 4:35:06 PM
|
PLM-Aging Inspection | 2/26/2003 | 2/26/2003 | 2/26/2003 | | NR |
Bill VanDegrift
|
|
|
keep it open 2/26/2003 9:06:11 AM
|
PLM-Aging Inspection | 12/27/2002 | 12/27/2002 | 12/27/2002 | | NR |
Bill VanDegrift
|
|
|
going to leave this open for awhile 12/27/2002 10:56:10 AM
|
Water and/or Sewer | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PART |
Bill VanDegrift
|
|
|
s.s. by interceptor laid ok needs testing
|
Water and/or Sewer | 10/22/2002 | 10/22/2002 | 10/22/2002 | A | PART |
Bill VanDegrift
|
|
|
another conference, s.s. expose upper end to lamp, replace lower section due to alighnment and backgrade
|
Water and/or Sewer | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | FAIL |
Bill VanDegrift
|
|
|
conference with claton with laton about replacing 6" s.s. by interceptot
|
Water and/or Sewer | 10/17/2002 | 10/17/2002 | 10/17/2002 | P | FAIL |
Bill VanDegrift
|
|
|
s.s. at the grease interceptor is backgraded at the manhole for 25-30' and is way out of alighment
|
Water and/or Sewer | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | FAIL |
Bill VanDegrift
|
|
|
grease line test remove reinstalled tee on the grease line and install wye, discharge side of grease interceptor seems to have been reinstalled with grade but no bedding, found large rocks on line , expose and bed call for reinspection, storm drain main is backgraded in vacinity of the replaced 8" rain drain line from tug area. 10/14/2002 9:48:44 AM
|
Water and/or Sewer | 10/2/2002 | 10/2/2002 | 10/2/2002 | A | NR |
Bill VanDegrift
|
|
|
the sewer at the grease interceptor is in the process of being exposed. so far the stub from the s.s. to the interceptor had nogrgade, the interceptor needed to be raised 8" the grease line from the interceptor to the building had to be raised and a s.s. stub removed from it and tied to the s.s. line, could be more s.s. connections tied to the grease line. work on the s.s. line hasn't started yet, need to verify grade, bedding, material, fittings and stub connections.
|
Water and/or Sewer | 9/26/2002 | 9/27/2002 | 9/27/2002 | A | PART |
Bill VanDegrift
|
|
|
interceptor test they had to reset the grease interceptor up 8". the water test on the interceptor is ok but all the piping in the area still needs to be reinstalled to the new elevations and grades need to be established on the portions covered without inspections and tested, could still need to be remover and reinstalled from building to main. 9/27/2002 11:22:54 AM
|
Water and/or Sewer | 9/19/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Ron Ginner
|
|
|
buess exc exposed three inch water line to vault. material is approved and bedding material is ok.
|
Water and/or Sewer | 9/18/2002 | 9/18/2002 | 9/18/2002 | A | FAIL |
Ron Ginner
|
|
|
buess exc exposed cooling tower supply and return. needs to expose 3" WATER LINE TO CHECK MATERIAL.
|
Storm Drains | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PASS |
Ron Ginner
|
|
|
buess exc exposed storm drains in three locations under elevated road on north side of terminal. 6 inch bedded in chip, ok. graded to man hole from both ends with cleanout risors at each end.
|
Storm Drains | 8/30/2002 | 9/3/2002 | 9/3/2002 | P | PART |
Bill VanDegrift
|
|
|
STORM DRAINS SOUTH SIDE partial rain drains ok south west side ok 9/4/2002 10:18:19 AM
|
Storm Drains | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PART |
Bill VanDegrift
|
|
|
STORM DRAIN LINES FROM BLDG TO MANHOLE SOUTH EAST BY ROAD WAY
|