Plumbing Rough-in | 9/18/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/18/2002 at 06:52:48. Contact: ###-####.
|
Plumbing Rough-in | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 10:40:09. Contact: ###-####. this is for the partial ri in the floor of the 2nd floor. test ok 8/30/2002 1:39:10 PM
|