Final | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 08:36:52. Contact: ###-####.
|
Plumbing Rough-in | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:13:36. Contact: ###-####.
|
Plumbing Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | CANC |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 08:22:59. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/27/2002 at 10:12:38.
|