Final | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 10:48:02 AM. Contact: ###-####.
|
Final | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 3/14/2003 at 9:16:18 AM. Contact: ###-####. house should be open
|
Plumbing Rough-in | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 10:28:04. Contact: ###-####.
|
Plumbing Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | FAIL |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 10:42:08. Contact: ###-####. shower trap on second floor not true to its seal. structural conditions. allow running trap in shower drain. 9/22/2002 11:59:59 PM
|