Water and/or Sewer | 9/16/2002 | 9/16/2002 | 9/16/2002 | P | PASS |
Jim Johnson
|
|
|
RYAN ###-####
|
Roof Drains | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | FAIL |
Jim Johnson
|
|
|
need to re-do roof drain,s lower piping and grade told contractor on job site will re call when ready 9/13/2002 12:30:23 PM
|
Water and/or Sewer | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | PART |
Jim Johnson
|
|
|
###-#### sewer line ok need to change water line to 1-1/4 as per plan told contractor on job site will recall when ready 9/13/2002 12:31:24 PM
|