Final | 2/10/2003 | 2/11/2003 | 2/11/2003 | P | PASS |
Jim Johnson
|
|
|
call mark first ###-#### he is 10min away
|
Final | 1/27/2003 | 1/29/2003 | 1/29/2003 | P | PART |
Jim Johnson
|
|
|
###-#### need to install water heater pan and pipe to outside need to caulk around base of toilet,s and tub spout home owner to recall when ready 1/29/2003 4:01:30 PM
|
Plumbing Rough-in | 11/26/2002 | 11/27/2002 | 11/27/2002 | P | PART |
Jim Johnson
|
|
|
Mark, ###-#### home owner need to provide 2 inch trap for shower drain 11/27/2002 3:40:15 PM
|
Plumbing Rough-in | 10/30/2002 | 10/31/2002 | 10/31/2002 | P | PART |
Jim Johnson
|
|
|
after 1pm ###-#### need to to install tub&shower valve and test 10/31/2002 5:18:12 PM
|
Plumbing Rough-in | 10/16/2002 | 10/17/2002 | 10/17/2002 | P | PASS |
Ron Ginner
|
|
|
mark ###-####
|
Plumbing Rough-in | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 10:56:17. Contact: ###-####. conf. only 10/7/2002 4:24:36 PM
|