Final | 11/29/2002 | 11/29/2002 | 11/29/2002 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/29/2002 at 07:58:38. Contact: ###-####.
|
Plumbing Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 06:54:26. Contact: ###-####.
|
Plumbing Rough-in | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 07:35:34. Contact: ###-####. waste test failed 10/21/2002 1:42:27 PM
|