Final | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Bill VanDegrift
|
|
|
got a permit for the south side that was a fee waved project the north side final is ok 5/14/2003 10:32:27 AM
|
Final | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/6/2003 at 10:28:16 AM. Contact: ###-####. north side seems ok but the permit is screwed up, called cory with rm and left a message for him to call me 5/6/2003 3:00:48 PM
|
Plumbing Rough-in | 11/14/2002 | 11/15/2002 | 11/15/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/14/2002 at 20:21:53. Contact: ###-####. ri ok 11/15/2002 10:36:36 AM
|
Plumbing Rough-in | 11/7/2002 | 11/8/2002 | 11/8/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 20:34:34. Contact: ###-####. nail plates in shower, backgraded vent from 1st floor lav to shower, also needs a hanger there, waster test failed. 11/8/2002 2:11:12 PM
|
Plumbing Rough-in | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 12:14:32. Contact: ###-####. r/i ok 10/22/2002 11:45:24 AM
|
Plumbing Rough-in | 10/18/2002 | 10/18/2002 | 10/18/2002 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 06:57:43. Contact: ###-####. use shielede coupling at building drain/sewer connection, provide a guage on the water system , check fixture count when r/i is completed. 10/18/2002 9:26:14 AM
|