Final | 1/13/2003 | 1/23/2003 | 1/23/2003 | A | PASS |
Gary Ziegler
|
|
|
###-####
|
Final | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | NR |
Gary Ziegler
|
|
|
###-####
|
Plumbing Rough-in | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Ron Ginner
|
|
|
###-####
|
Plumbing Rough-in | 10/31/2002 | 10/31/2002 | 10/31/2002 | P | NR |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 07:54:43. Contact: ###-####.
|
Plumbing Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | FAIL |
Ron Ginner
|
|
|
###-####ran a shower drain into the island fixture drain, wet vent, decker to change 10/30/2002 10:13:48 PM
|