Final | 2/17/2003 | 2/18/2003 | 2/18/2003 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/17/2003 at 4:03:21 PM. Contact: ###-####. floors all glued for carpet no access to the restrooms this am 2/18/2003 9:51:06 AM
|
Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok 2/18/2003 1:51:12 PM
|
Plumbing Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 | P | PASS |
Bill VanDegrift
|
|
|
just check the water repipe in the crawl ri ok 1/10/2003 2:46:26 PM
|
Plumbing Rough-in | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 08:41:48. Contact: ###-####.
|
Plumbing Rough-in | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PART |
Bill VanDegrift
|
|
|
top ri ok supply cw to shower and ss from cw feed to wh 1/9/2003 3:05:10 PM
|
Groundwork | 11/14/2002 | 11/14/2002 | 11/14/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/14/2002 at 10:06:35. Contact: ###-####. sewer stub into the building and the vent from the interceptor 11/14/2002 3:23:36 PM
|