Final | 9/5/2003 | 9/5/2003 | 9/5/2003 | P | PASS |
Gary Ziegler
|
|
|
|
Final | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | CANC |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 7:37:23 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/28/2003 | 1/28/2003 | 1/28/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 07:38:41. Contact: ###-####. 1/28/2003 1:05:58 PM
|
Groundwork | 11/14/2002 | 11/15/2002 | 11/15/2002 | A | PASS |
Gary Ziegler
|
|
|
pat ###-####
|