Final | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 08:13:33. Contact: ###-####. left message with louise with p.w. about the ground work on the west side of the building 2-wc, 2-lavs, in addition to the finished restrooms on this plan. final ok 12/30/2002 2:28:33 PM
|
Plumbing Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PASS |
Bill VanDegrift
|
|
|
###-#### ri ok 12/9/2002 3:22:11 PM
|
Groundwork | 11/27/2002 | 12/2/2002 | 12/2/2002 | P | PART |
Bill VanDegrift
|
|
|
###-#### gw ok they added 2 future restroom ground works on the west side of this job and will need stamped resubmittals for them. 12/2/2002 10:29:44 AM
|