Final | 3/10/2003 | 3/10/2003 | 3/10/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 9:19:24 AM. Contact: ###-####.
|
Final | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/20/2003 at 4:11:21 PM. Contact: ###-####. 2/21/2003 10:12:59 AM need to lower water line to approved depth out by water meter before final on plumbing 2/21/2003 11:04:50 AM
|
Plumbing Rough-in | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 07:38:17. Contact: ###-####.
|
Groundwork | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | PASS |
Jim Johnson
|
|
|
###-####
|