Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 10:41:53 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 09:19:50. Contact: ###-####.
|
Plumbing Rough-in | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/19/2002 at 08:45:57. Contact: ###-####. rigged guage set at 5 psi, waste test failed, didn't even crawl this one due to no pressure on the waste system. 12/19/2002 3:31:53 PM
|
Plumbing Rough-in | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | NR |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/13/2002 at 07:54:47. Contact: ###-####.\\NOT READY
|