Final | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/18/2003 at 11:21:53 AM. Contact: ###-####. final ok, david said he was taking responsibility for the water softeror installed by san ray plumbing. 3/18/2003 2:20:08 PM
|
Plumbing Rough-in | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 08:59:35. Contact: ###-####.
|