Final | 2/5/2003 | 2/6/2003 | 2/6/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 18:50:52. Contact: ###-####.
|
Plumbing Rough-in | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 08:52:19. Contact: ###-####.
|