PLM-Aging Inspection | 9/24/2003 | 9/24/2003 | 9/24/2003 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 6/18/2003 | 6/18/2003 | 6/18/2003 | | PASS |
Jim Johnson
|
|
|
|
Final | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PART |
Jim Johnson
|
|
|
ok,ed temp will final when premise backflow protection is installed 4/18/2003 10:45:59 AM
|
Final | 4/8/2003 | 4/8/2003 | 4/8/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 7:43:07 AM. Contact: ###-####. need to install premise backflow protection as required by cross control connection program and water purveyor prior to final inspection 4/9/2003 2:41:33 PM
|
Plumbing Rough-in | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 8:41:50 AM.
|
Groundwork | 1/10/2003 | 1/10/2003 | 1/10/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 10:40:23. Contact: ###-####.
|
Water and/or Sewer | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/07/2003 at 08:53:23. Contact: ###-####. sewer line test ok ok to cover 1/7/2003 5:28:09 PM
|
Groundwork | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 07:51:56. Contact: ###-####. groundwork for new bathroom and kit sink and outside sewer out to front of building test ok ok to cover up to that point by main entrance 12/30/2002 4:59:29 PM
|
Groundwork | 12/24/2002 | 12/24/2002 | 12/24/2002 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/24/2002 at 09:32:37. Contact: ###-####. test failed on drain,s waste and vent,s 12/24/2002 2:31:06 PM
|