Final | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/25/2003 at 10:17:00 AM. Contact: ###-####. final ok 2/25/2003 3:48:21 PM
|
Final | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 9:25:19 AM. Contact: ###-####. hold final till sewer connection is made 2/18/2003 2:44:22 PM
|
Plumbing Rough-in | 1/2/2003 | 1/3/2003 | 1/3/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 16:49:19. Contact: ###-####. ri ok 1/3/2003 9:12:42 AM
|
Plumbing Rough-in | 1/2/2003 | 1/2/2003 | 1/2/2003 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 08:48:15. Contact: ###-####. waste and vent test failed 1/2/2003 4:02:46 PM
|