Final | 4/17/2003 | 4/17/2003 | 4/17/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/17/2003 at 8:02:28 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 08:05:40. Contact: ###-####.
|
Groundwork | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 09:07:49. Contact: ###-####.
|