Final | 9/26/2003 | 9/26/2003 | 9/26/2003 | A | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 9/22/2003 | 9/22/2003 | 9/22/2003 | | PASS |
Jim Johnson
|
|
|
|
Final | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser need to test untested roof drains need to complete sign,s for all nonpotable water service out let,s finish installation of eye wash sink 7/21/2003 5:17:46 PM
|
Other | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Jim Johnson
|
|
|
main restroom,s up and down staires are finished plumbers still need to finish installation on fixtures in various area,s in the building oked temp. occupancy note - had a discussion with John plumbing foreman on job site that the water service lines to the service bay area,s will need to be installed on a seperate line protected by a reduced pressure backflow assembly and provide approved identification of nonpotable water system at each location as per upc - 601.2 and 601.2.2 7/17/2003 5:52:14 PM
|
Other | 7/14/2003 | 7/15/2003 | 7/15/2003 | P | PART |
Jim Johnson
|
|
|
need to grout sewer lines in man hole on south west corner of building before issuing a temp 7/16/2003 2:48:36 PM
|
Other | 7/14/2003 | 7/14/2003 | 7/14/2003 | P | NR |
Jim Johnson
|
|
|
Partial Final for today as late as possible thank you.; Phone #: ###-#### Internet Inspection Request from: Liz Sasser not ready 7/14/2003 5:49:45 PM
|
Groundwork | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PART |
Jim Johnson
|
|
|
Rough- in inspection for Section A.
Also we need a inspection for the Roof Drain on Section A & B , Thank you ; Phone #: ###-#### Internet Inspection Request from: Liz Sasser rest room in area a rough-in ok roof drains and over flow drains, in area a test ok over flow drains in area b test ok still need to test roof drainsin area b 6/23/2003 4:57:14 PM
|
Plumbing Rough-in | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PART |
Jim Johnson
|
|
|
Partial Rough -in at section A; Phone #: ###-#### Internet Inspection Request from: Liz Sasser in wall rough-in for area a first and second floor restroom,s breakroom sink,s and manager restroom test ok ok to cover 6/2/2003 4:56:27 PM
|
Plumbing Rough-in | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 9:19:55 AM. Contact: ###-####. rough-in on restroom in area a and breakroom sink test ok ok to cover 5/8/2003 3:42:56 PM
|
Water and/or Sewer | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 11:25:14 AM. Contact: ###-####.
|
Water and/or Sewer | 4/24/2003 | 4/24/2003 | 4/24/2003 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 9:11:05 AM. Contact: ###-####. need to correct reverse grade in sewer line 4/24/2003 4:30:02 PM
|
Groundwork | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | PART |
Jim Johnson
|
|
|
rest room groundwork in area b test ok ok to cover 3/19/2003 12:22:34 PM
|
Groundwork | 3/17/2003 | 3/18/2003 | 3/18/2003 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 4:03:34 PM. Contact: ###-####. unable to inspect all of groundwork because of crain swinging steel truss,s overhead 3/18/2003 4:30:24 PM
|
Groundwork | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/25/2003 at 8:16:03 AM. Contact: ###-####. groundwork in area b water test ok ok to cover 2/25/2003 12:58:05 PM
|
Groundwork | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 10:06:47 AM. Contact: ###-####. groundwork for area a water test ok ok to cover 2/21/2003 3:14:38 PM
|
Groundwork | 1/22/2003 | 1/23/2003 | 1/23/2003 | P | PART |
Jim Johnson
|
|
|
###-#### terry building water supply stub out to 5 foot outside building test ok 1/23/2003 3:09:19 PM
|
Groundwork | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PART |
Jim Johnson
|
|
|
after 2pm ###-#### air test on groundwork in area c and d test ok 1/22/2003 4:02:39 PM
|
Groundwork | 1/16/2003 | 1/17/2003 | 1/17/2003 | A | PART |
Jim Johnson
|
|
|
john ###-#### bathroom group in area -c test ok 1/17/2003 10:04:23 AM
|
Plumbing Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | PART |
Jim Johnson
|
|
|
partial ground work--terry ###-#### grease trunk line test ok 1/10/2003 2:29:43 PM
|