Final | 10/1/2003 | 10/1/2003 | 10/1/2003 | P | PASS |
Jim Johnson
|
|
|
upstairs; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Final | 8/14/2003 | 8/15/2003 | 8/15/2003 | P | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser oked temp. Debest plumbing to fax copy of med gas veification and final testing report along with a approved letter from Qunatum eng. verifying deveation on med gas plan,s monday 8/18/ 2003 8/15/2003 5:21:33 PM
|
Other | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PART |
Bill VanDegrift
|
|
|
conference on correction notice 8/12/2003 3:27:39 PM
|
Final | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser 8/8/2003 2:35:54 PM open front seats on wc, hook up equipment, certifymed gas system, access to slip nuts and fixture supplies on hand sinks, screen intake and exhaust, add lables to med gas system, need med gas system alarm set, verify deveations to approved med gas plans and letter with quantum eng., resubmit plan showing all changes to approved drawings. 8/8/2003 2:40:54 PM
|
PLM-Aging Inspection | 6/23/2003 | 6/23/2003 | 6/23/2003 | | PASS |
Jim Johnson
|
|
|
still working on project 6/23/2003 10:48:03 AM
|
Plumbing Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | A | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 11:28:33 AM. Contact: ###-####. canc. by justin rough-in not ready contractor to recall when ready 4/22/2003 4:14:11 PM
|
Plumbing Rough-in | 4/23/2003 | 4/23/2003 | 4/23/2003 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/23/2003 at 9:29:09 AM. Contact: ###-####. needto support vent,s every four feet need to correct wet vented portion on washer and lav in basement 4/23/2003 4:20:00 PM
|
Plumbing Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 10:44:51 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 22 2003 11:28AM.
|
Groundwork | 3/25/2003 | 3/25/2003 | 3/25/2003 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/25/2003 at 10:37:03 AM. Contact: ###-####. plumbing contractor added three floor drain,s and one floor drain to existing ground work 3/25/2003 3:36:58 PM
|
Groundwork | 1/29/2003 | 1/30/2003 | 1/30/2003 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 16:32:13. Contact: ###-####.
|
Groundwork | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PASS |
Ron Ginner
|
|
|
|
Plumbing Rough-in | 1/15/2003 | 1/16/2003 | 1/16/2003 | A | PART |
Jim Johnson
|
|
|
###-####\\PARTIAL in-wall plumbing only test ok 1/15/2003 4:10:11 PM
|
Groundwork | 1/13/2003 | 1/14/2003 | 1/14/2003 | A | PART |
Jim Johnson
|
|
|
sewer trunk line for builbing test ok ok to cover 1/14/2003 10:18:48 AM
|
Groundwork | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | NR |
Jim Johnson
|
|
|
###-#### not ready 1/13/2003 5:44:29 PM
|
Final | 9/18/2003 | 9/18/2003 | | P | |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/18/2003 at 9:44:39 AM. Contact: ###-####.
|