Final | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 14:11:26. Contact: ###-####. final roughin only need new permit when they set fixtures 2/4/2003 9:57:11 AM
|
Plumbing Rough-in | 1/15/2003 | 1/15/2003 | 1/15/2003 | P | PASS |
Gary Ziegler
|
|
|
|
Plumbing Rough-in | 1/14/2003 | 1/14/2003 | 1/14/2003 | P | FAIL |
Gary Ziegler
|
|
|
###-#### waste test failed 1/14/2003 3:21:44 PM
|