Final | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | PASS |
Bill VanDegrift
|
|
|
###-#### ray final ok 7/24/2003 3:05:43 PM
|
Final | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 10:44:21 PM. Contact: ###-####. test fire system dcva 7/18/2003 10:52:21 AM
|
Plumbing Rough-in | 2/11/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/11/2003 at 11:10:37. Contact: ###-####. ri ok 2/13/2003 2:28:53 PM
|