Permit Information
Permit NumberPLM03-00308
StatusFinaled
Name MERIDIAN PLUMBING CO
Site Address 10172 W SMOKE RANCH DR
Project NameAlzheimers Care Facility
Customer Number 
ePlanReview 
Description
2/7/03//alzheimers care facility/34 bed facility/all plm, fixtures/initial cert of value $50,758/mls
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/25/20038/26/20038/26/2003APASS
DetailsJim Johnson
supposed to be completely ready; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL
Final8/18/20038/19/20038/19/2003PPART
DetailsJim Johnson
oked temp plumbing contractor waiting to find out what type of coffee maker will be installed may or may not require backflow device 8/19/2003 3:26:03 PM
Final8/15/20038/18/20038/18/2003APART
DetailsJim Johnson
Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL need to finish setting all fixtures , caulk mop sink,s to wall and floor 8/18/2003 5:41:26 PM
Final8/5/20038/6/20038/6/2003ANR
DetailsJim Johnson
OK, AT THIS FINAL THERE REALLY IS A NORTH & SOUTH SECTION TO DO AN INSPECTION ON, THANKS, RENEE; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL not ready contractor to recall when ready 8/6/2003 12:07:56 PM
Plumbing Rough-in6/5/20036/5/20036/5/2003PPASS
DetailsJim Johnson
READY LATE PM; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL
Plumbing Rough-in5/20/20035/20/20035/20/2003PPASS
DetailsJim Johnson
WILL BE READY EARLY PM FOR ROUGH IN INSPECTION; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL rough-in on south wing ok 5/20/2003 5:26:06 PM
Plumbing Rough-in5/7/20035/7/20035/7/2003PPASS
DetailsJim Johnson
READY FOR RE-INSPECTION. THANKS, RENEE; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL north wing rough-in ok 5/7/2003 3:39:59 PM
Plumbing Rough-in5/5/20035/6/20035/6/2003APART
DetailsJim Johnson
PLEASE DO INSPECTION MONDAY PM IF POSSIBLE, AS LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL need to move cold water out of soffit vent area repipe p-14 with 3/4 not 1/2 and retest water system 5/6/2003 10:13:47 AM
Groundwork3/18/20033/18/20033/18/2003PPASS
DetailsJim Johnson
PLEASE TRY TO DO INSPECTION ABOUT 11AM THIS MORNING/TUESDAY 3/18/03. THANKS ; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL
Groundwork3/13/20033/14/20033/14/2003APART
DetailsJim Johnson
PLEASE DO A PARTIAL GROUNDWORK INSPECTION FOR THE CENTER PART OF THE BUILDING, MID AM FRIDAY 3/14/03. THANKS CHRIS.; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL kit area groundwork test ok 3/14/2003 12:34:59 PM
Plumbing Rough-in3/12/20033/12/20033/12/2003PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 3/12/2003 at 10:08:03 AM. Contact: ###-####. north third of building is ground worked now. 3/12/2003 2:42:03 PM
Groundwork3/11/20033/11/20033/11/2003PPART
DetailsJim Johnson
PLEASE DO PARTIAL GROUNDWORK INSPECTION THIS AM BETWEEN 10:30-11AM IF AT ALL POSSIBLE.. IF NOT RIGHT AFTER LUNCH.. THANKS, RENEE; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL 12 bathroom group,s on north end of building groundwork test ok ok to cover 3/11/2003 11:42:07 AM
Groundwork2/27/20032/28/20032/28/2003APART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 2/27/2003 at 11:45:00 AM. Contact: ###-####. grease intercepter test ok ok to cover 2/27/2003 3:11:07 PM
Groundwork2/26/20032/26/20032/26/2003PPART
DetailsJim Johnson
###-#### sewer trunk line test ko ok to cover 2/26/2003 2:29:51 PM