Final | 4/16/2003 | 4/17/2003 | 4/17/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/16/2003 at 2:07:17 PM. Contact: ###-####. final ok 4/16/2003 2:51:19 PM
|
Final | 4/10/2003 | 4/10/2003 | 4/10/2003 | P | PART |
Bill VanDegrift
|
|
|
set trim 4/10/2003 4:57:48 PM
|
Plumbing Rough-in | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PART |
Bill VanDegrift
|
|
|
more tubs in the main building 4/10/2003 11:40:24 AM
|
Plumbing Rough-in | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | PART |
Bill VanDegrift
|
|
|
6 tubs main building
|
Plumbing Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Bill VanDegrift
|
|
|
I,ve been stopping by to check on this project when they call theie in the north building replacing valves now and everything seems ok, the south east building is done with the valve replacement, the main building is still waiting on the fire wall plan where they are replacing some tubs.
|
Plumbing Rough-in | 2/26/2003 | 2/27/2003 | 2/26/2003 | P | FAIL |
Bill VanDegrift
|
|
|
seems they need a building permit out here, no additional inspections to be done untill a building permit has been issued.
|
Plumbing Rough-in | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PART |
Bill VanDegrift
|
|
|
not much going on yet today 2/26/2003 10:04:29 AM
|
Plumbing Rough-in | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | PART |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PART |
Bill VanDegrift
|
|
|
jan ###-#### tubs 1st floor some valve replacements 2/25/2003 2:47:33 PM
|