Final | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 4/9/2003 at 4:00:11 PM. Contact: ###-####. rp installed and tested. 4/10/2003 11:15:27 AM
|
Other | 3/26/2003 | 3/27/2003 | 3/27/2003 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 3:17:15 PM. Contact: ###-####. install dcva premise,rp on insides hosbibb,avb outside bibb cut threads off laundry sink gz 3/27/2003 2:34:30 PM
|
Final | 3/26/2003 | 3/26/2003 | 3/26/2003 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 8:01:25 AM. Contact: ###-####. need backflow survey gz 3/26/2003 3:16:44 PM
|
Plumbing Rough-in | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Gary Ziegler
|
|
|
shyrl; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|