Final | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/17/2003 at 2:39:45 PM. Contact: ###-####.
|
Final | 4/3/2003 | 4/3/2003 | 4/3/2003 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 8:48:11 AM. Contact: ###-####. glue tand p line developer not on site gz aScheduled by a contractor via Hello! on 4/3/2003 at 8:48:11 AM. Contact: ###-####. 4/3/2003 1:00:20 PM
|
Plumbing Rough-in | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 5:17:21 PM. Contact: ###-####.
|