Final | 5/21/2003 | 5/21/2003 | 5/21/2003 | A | PASS |
Bill VanDegrift
|
|
|
final ok
|
Plumbing Rough-in | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PASS |
Bill VanDegrift
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Annette Moore recieved cut sheets from arch. final ok 5/21/2003 9:41:48 AM
|
Water and/or Sewer | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | PART |
Bill VanDegrift
|
|
|
looked at the vent from the pump chamber, still no word from the arch. about interceptor design
|
Water and/or Sewer | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PART |
Bill VanDegrift
|
|
|
call curt about getting some plans ###-#### met with general contractor and gave him a correction notice to provide pressure sewer design drawings. 3/21/2003 9:23:45 AM tank and sewer line test ok 3/21/2003 11:00:47 AM
|
Water and/or Sewer | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### MIKE provide a set of approved plans with all attachments, test sewer and waer services, vent required on pump chamber. 3/20/2003 9:11:58 AM
|
Water and/or Sewer | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PART |
Bill VanDegrift
|
|
|
water service and test ok, still need plans
|