Final | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 5/6/2003 at 9:32:44 AM. Contact: ###-####.
|
Plumbing Rough-in | 3/17/2003 | 3/18/2003 | 3/18/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 11:37:46 AM. Contact: ###-####.
|
Plumbing Rough-in | 3/14/2003 | 3/17/2003 | 3/17/2003 | A | FAIL |
Ron Ginner
|
|
|
###-#### johns need 3-2 inch cleanouts in crawel space. 3/17/2003 11:48:46 AM
|