Final | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Jim Johnson
|
|
|
|
Final | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Jim Johnson
|
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need to provide air gap on t&p at mop basin 5/29/2003 6:38:02 PM
|
Final | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | FAIL |
Bill VanDegrift
|
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec thermol expantion protection required, t&p drain requires an air gap, urinal trim incomplete, going to staff meeting and will find out if there is a code section addressing offsets in flushometer tailpiece. 5/22/2003 9:55:42 AM
|
Final | 5/22/2003 | 5/22/2003 | 5/22/2003 | P | PART |
Bill VanDegrift
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore temp occ ok, needs air gap at the t&p drain, finish urinal trim, the offset on the flushometers is ok and the thermol expantion is already in place at the premise protection. 5/22/2003 3:06:44 PM
|
Plumbing Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PASS |
Jim Johnson
|
|
|
late pm ###-####
|
Groundwork | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 3/18/2003 | 3/19/2003 | 3/19/2003 | P | NR |
Jim Johnson
|
|
|
FREEDOM MECH ###-####
|