Final | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PASS |
Bill VanDegrift
|
|
|
office; Phone #: ###-#### Internet Inspection Request from: Darla Downs final ok revised fixture count 2- wc, 4- lav, 4-tub/shower, 1- sink, 1-wb, 1-wh. 7/16/2003 3:36:14 PM 7/16/2003 3:37:04 PM
|
Water and/or Sewer | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | PASS |
Jim Johnson
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Plumbing Rough-in | 4/11/2003 | 4/14/2003 | 4/14/2003 | A | PASS |
Jim Johnson
|
|
|
dorothy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Plumbing Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | FAIL |
Jim Johnson
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs test failed on D.W.V. and water system,s 4/11/2003 2:21:06 PM
|
Plumbing Rough-in | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | PASS |
Jim Johnson
|
|
|
###-#### washer groundwork ok ok to cover 3/28/2003 9:27:22 AM
|
Plumbing Rough-in | 3/26/2003 | 3/27/2003 | 3/27/2003 | A | PART |
Jim Johnson
|
|
|
JIM -- ###-#### under floor drain,s and water in new addition test ok 3/27/2003 11:01:44 AM
|