Final | 5/29/2003 | 5/29/2003 | 5/29/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 7:30:14 AM. Contact: ###-####. final ok 5/29/2003 10:47:04 AM
|
Plumbing Rough-in | 4/22/2003 | 4/24/2003 | 4/24/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 7:32:19 AM. Contact: ###-####.tub roughin okay. need access for motor on trim. 4/24/2003 9:34:14 AM
|
Plumbing Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | PASS |
Bill VanDegrift
|
|
|
rob-- ###-#### ri ok 4/4/2003 2:57:29 PM
|