Final | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 6:27:57 PM. Contact: ###-####.
|
Plumbing Rough-in | 4/16/2003 | 4/16/2003 | 4/16/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/16/2003 at 7:47:13 AM. Contact: ###-####.
|
Groundwork | 4/8/2003 | 4/8/2003 | 4/8/2003 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 11:12:31 AM.
|
Plumbing Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | PART |
Gary Ziegler
|
|
|
###-#### upstairs ok gz 4/4/2003 1:59:15 PM
|