Final | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 11:05:15 AM. Contact: ###-####.
|
Plumbing Rough-in | 4/10/2003 | 4/10/2003 | 4/10/2003 | P | PASS |
Ron Ginner
|
|
|
jim ###-#### drain for future kitchen remodel will be installed through basement to sump. vent for washing machine and floor drain will be installed through basement into sump area and tied into vent system. will be checked on final inspection. 4/10/2003 1:39:11 PM
|