Final | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 10:37:10 AM. Contact: ###-####. final this job, the waste was redone to drain to new f.s. the below slab was a left over from some airport handyman nightmare and if it gives them trouble it serves them right. 5/2/2003 10:32:50 AM
|